To: J3 09-153r1 From: Stan Whitlock Subject: Minutes of meeting #187 Date: 4 May 2009/18 February 2009 Minutes of INCITS/PL22.3 Committee Meeting #187 formerly known as INCITS/J3 February 9-13, 2009 Fairfield Inn by Marriott Las Vegas, NV Notes: ------ 1. J3 has been renamed from INCITS/J3 to INCITS/PL22.3. In these minutes, the committee will be referred to as J3. 2. J3 papers are referenced herein as 09-nnn. They are available from http://www.j3-fortran.org/ WG5 papers are referenced as Nnnnn. They are available from http://www.nag.co.uk/SC22WG5/ 3. Notation: (name1/name2) - moved by name1, seconded by name2 uc - motion passed with no objection, ie, unanimous consent post rn - paper revision n will be in the post meeting distribution SV - straw vote, sometimes with choices Y-N-U, ie, Yes - No - Undecided End notes 0. List of papers passed at meeting #187 ---------------------------------------- This is a list of the paper numbers that passed at meeting #187, including interpretations. The reference is to the latest revision on the J3 server after the meeting, not to the actual revision that was voted upon. The motions below reference the actual revision voted upon. 09-100 09-114r3 09-124 09-133 09-143r3 09-103 09-115r1 09-125 09-134r1 09-144 09-104 09-116r1 09-126r1 09-135 09-145r1 09-105r1 09-117 09-127r1 09-136 09-146 09-106r1 09-118r1 09-128 09-137r2 09-147r1 09-107r2 09-119r3 09-129r1 09-138r2 09-148 09-110 09-121r1 09-130r1 09-139 09-149 09-112 09-122r1 09-131r3 09-141 09-150 09-113r1 09-123 09-132r1 09-142r2 09-151 The interpretations created by this meeting were: interp F03/0128 == 09-115r1 0129 == 09-121r1 The interpretations passed by this meeting were: interp F03/0063 == 09-148 F03/0119 == 09-103 0064 == 09-149 0128 == 09-115r1 0065 == 09-150 0129 == 09-121r1 1. Monday, February 9, 2009 8:00 AM ------------------------------------ 1.1 Opening Business 1.1.1 Remarks from the chair Dan Nagle (J3 chair) welcomed everyone to the meeting and started working through the J3 Agenda. Our goal this week is to finish editorial work on the draft Fortran 008 Standard. 1.1.2 Adoption of agenda ** motion: adopt agenda (Snyder/Long): unanimous consent {uc} 1.1.3 Approval of Meeting 186 minutes ** motion: approve 09-100 minutes of meeting 186 (Long/Snyder): uc 1.1.4 INCITS/OMC report - Dan Nagle Rex Jaeschke (SC22 Chair) is visiting all of the Technical Committees. Dan will not be attending the meeting of chairs of the TCs. Dan's report is due to INCITS in March. As always, Van drew everyone's attention to the anti-trust guidelines at www.incits.org/inatrust.htm and the patent guidelines at http://www.incits.org/pat_slides.pdf . 1.1.5 SC22/WG23 - Dan Nagle There has been no more progress on writing the Fortran appendix for this draft standard. 1.1.6 ISO/WG5 report - Van Snyder The last WG5 meeting was in Tokyo, joint with J3 meeting 186. At that meeting, it was decided to allow no technical changes to the draft Fortran 2008 Standard. 1.1.7 J11 Liaison report - Craig Rasmussen Craig was not present yet to give a report. 1.1.8 MPI Liaison report - Craig Rasmussen Craig was not present yet to give a report. Dan reported that the MPI group was meeting this week. Interoper- ability between MPI and Fortran is a priority. 1.1.9 UPC Liaison report - Dan Nagle Dan has had no interaction with the UPC group. 1.1.10 Treasurer's report - Van Snyder No expenditures since meeting 185. There was no income or expenses at meeting m186. Account balance same as at the end of meeting 185 == $2485.91 (See 08-273r1). There will be a $50 fee per attendee for this meeting. ** motion: excuse mallory North from the meeting fee (Snyder/Long): uc 1.1.11 Beginning membership report - Stan Whitlock Total Membership at beginning of Meeting 187 : 8 Majority : 5 Quorum : 4 Members Alternates M. Ingrassia B. Long J. Brixius J. Martin M. Cohen D. Nagle J. Reid & J. Wallin C. Rasmussen A. Donev & T. Moene V. Snyder S. Whitlock L. Menard & S. Lionel J. Xia K. Li * No one is in jeopardy of losing membership at the start of m187. * There was no sign up sheet for J3 attendees. Attendance at beginning of meeting 187 -------------------------------------- J3 members present: Bill Long Jeanne Martin Dan Nagle Craig Rasmussen Van Snyder Stan Whitlock J3 Alternates present: Malcolm Cohen - alternate to Jeanne Martin, voting Guests (not J3 members/alternates: Mallory North (Monday) 1.1.13 Local arrangements Dan is the host; Van is helping. 1.1.14 Comments from members /INTERP report (from Stan Whitlock): The new 09-006A is the latest list of F2003 interps: + includes m186 interps: submitted 125..127; passed 119, 125..127 + includes interps passed by WG5 vote 6 {N1764/N1770} There are two interps and one new answer in the m187 pre-meeting: * Paper 09-115 is interp F03/0128 * Paper 09-121 is interp F03/0129 * Paper 09-103 answers interp F03/0119 Paper 08-006AT3 from m185 contains the interps (N1730) for F2003 Corrigendum #3 (N1727) and paper 09-006AT4 from m187 contain the interps (N1764) for F2003 Corrigendum #4 (N1771) . These should be made standing documents to go along with the previous corrigenda. 1.2 Tutorials (if needed) None. 1.3 Subgroup organization: -------------------------- /JOR: Stan Whitlock (head), Dan Nagle /DATA: Malcolm Cohen (head), Jeanne Martin, Van Snyder /HPC: Bill Long (head), Craig Rasmussen /EDIT: Malcolm Cohen (head) /INTERP: Stan Whitlock (head) Paper distribution for subgroups: /JOR: 105, 106, 107, 109, 110, 111, 113, 114, 126, 127, 128, 132, 133, 136 /DATA: 104, 122, 123, 124, 125, 129, 130, 135, 139, 141 /HPC: 108, 112, 116, 117, 118, 119, 120, 131, 134, 140 /INTERP: 103, 115, 121, 137, N1771 /EDIT: 136 All J3: 100 (m186 minutes), 019, 020 1.4 Subgroup meetings 1.5 Subgroup reports (4:30 pm) /J3 The list of papers for voting, discussion, or action later in the week was discussed. Recessed 2. Tuesday, February 10, 2009 9:00 AM -------------------------------------- 2.1 F2008 Plenary (00-010) /JOR ** motion: Paper 09-105 section 2 "Clarify interaction of P and F editing" (Whitlock/Long) as amended: uc {post r1} ** motion: 09-106r1 "Relationship between scale factor and rounding mode" Whitlock/Snyder): uc ** motion: 09-107r1 "Editorial stuff - Indexing rounding mode" (Whitlock/Long) as amended: uc {post r2} ** motion: 09-110 "Result Value paragraph of 13.7.64 GAMMA is wrong" (Whitlock/Snyder): uc {Van will send TeK to Malcolm} /DATA ** motion: 09-104 last paragraph "Organizational inconsistencies concerning arrays" (Cohen/Snyder): uc Paper 09-122 "Spurious defined terms in clause 4": Straw Vote {SV}: do technical change at [72:14+]: Yes-No-Undefined: 7-0-0 ** motion: 09-122 as amended , including OPTIONAL at [76] (Cohen/ Snyder): uc {post r1} ** motion: 09-123 "Spurious defined terms in clause 5" (Cohen/Snyder): uc ** motion: 09-124 "Spurious defined terms in clause 6" (Cohen/Snyder): uc Paper 09-125 "Spurious defined terms in clause 7" SV: section 4, delete from DO CONCURRENT: Y-N-U: 3-3-0 implies {=>} leave it alone ** motion: 09-125, section 5 not including the OPTIONAL (Cohen/Synder): uc SV: Rename "initialization expressions" to "constant expressions": Y-N-U: 4-2-1 => Malcolm will try ** motion: 09-129r1 "Spurious defined terms in clause 11" (Cohen/Snyder): uc ** motion: 09-130r1 "Spurious defined terms in clause 12" including edit [10:5-7] (Cohen/Snyder): uc ** motion: 09-135 "Spurious defined terms in clause 16" (Cohen/Snyder): uc ** motion: 09-139 "Restructuring numeric types, specifying operations" (Martin/Snyder): uc ** motion: 09-141 "UTI 151 concerning USE and submodules" (Cohen/Snyder): uc ** motion: 09-133 "Spurious defined terms in clause 14" (Cohen/ Rasmussen): uc ** motion: 09-134r1 "Spurious defined terms in clause 15" (Cohen/Long): uc /HPC There will be no action taken on 09-108 "Alternative and simpler method for atomic accesses, UTI 154". ** motion: 09-112 "UTI 162, ATOMIC constants kinds" (Long/Rasmussen): uc ** motion: 09-116 "Coindexed actual arguments" (Long/Whitlock): withdrawn; given to /DATA ** motion: 09-117 "UTI 154, KIND of VALUE in ATOMIC_DEFINE/REF" (Long/ Rasmussen): uc ** motion: 09-118 "Coindexed scalars" (Long/Rasmussen): withdrawn Paper 09-119r1 "Files connected to more than one unit" was discussed but no action taken as yet. ** motion: 09-131r1 "UTI 153" (Long/Whitlock): withdrawn Paper 09-134 "Spurious defined terms in clause 15" had been assigned to /HPC but /DATA passed 09-134r1 so /HPC is done with 09-134. /EDIT ** motion: 09-136 "Editorial corrections" including the ALTERNATIVE to delete the note (Cohen/Snyder): uc /DATA graciously agreed to take 09-116, 09-118, and 09-131r1 from /HPC. 2.2 Tutorials (if needed) - None 2.3 Subgroup meetings 2.4 Subgroup reports /J3 The list of papers for voting, discussion, or action later in the week was discussed. Recessed 3. Wednesday, February 11, 2009 9:00 AM ---------------------------------------- 3.1 F2008 Plenary (00-010) /JOR ** motion: 09-113r1 "Spurious defined terms in clause 3" (Whitlock/ Cohen): uc ** motion: 09-126r1 "Spurious defined terms in clause 8" (Whitlock/ Cohen): uc ** motion: 09-127r1 "Spurious defined terms in clause 9" (Whitlock/ Cohen): uc ** motion: 09-128 "Spurious defined terms in clause 10" (Whitlock/ Cohen): uc ** motion: 09-132r1 "Spurious defined terms in clause 13" (Whitlock/ Cohen): uc /DATA ** motion: 09-116r1 "Coindexed actual arguments" (Cohen/Long): uc /INTERP ** motion: 09-103 section 2 as the answer to interp F03/0119 (Whitlock/ Cohen): uc ** motion: 09-103 section 3 as an edit to F2008 (Whitlock/Cohen): uc 3.2 Tutorials (if needed) - None 3.3 Subgroup meetings 3.4 Subgroup reports /INTEROP Paper 09-140 "Dimension(**) syntax to correct oversight in interop TR" was discussed: SV: pursue DIMENSION(**) as described in 09-140: Y-N-U: 1-6-0 => 09-140 will receive no further action /J3 The list of papers for voting, discussion, or action later in the week was discussed. Recessed 4. Thursday, February 12, 2009 9:00 AM --------------------------------------- ** /J3 ** 4.1 F2008 Plenary /JOR No further action will be taken on 09-111 "Editorial stuff concerning namelist" - it is superseded by 09-114. ** motion: 09-114r1 "Namelist edits" (Whitlock/Long) as amended: withdrawn /DATA ** motion: 09-118r1 "Coindexed scalars" (Cohen/Long): uc ** motion: 09-131r2 "UTI 153" (Cohen/Snyder) as amended: uc {post r3} /HPC ** motion: 09-119r2 "Files connected to more than one unit" as amended (Long/Rasmussen): uc {post r3} ** motion: 09-120 "Pointer components and coindexed arguments" as amended (Long/Whitlock): withdrawn ** motion: 09-142r1 "UTI's 155-158 - LOCK variables, C6" (Long/ Rasmussen): withdrawn ** motion: 09-143r1 "UTI 161 - LOCK_TYPE, C13" (Long/Rasmussen): withdrawn ** motion: 09-147 "UTI's 159,160 - [UN]LOCK statements, C8" (Long/ Rasmussen): withdrawn /EDIT ** motion: 09-144 "Fix constants in ISO_FORTRAN_ENV" (Cohen/Whitlock): uc ** motion: 09-145 'Change "initialization expression" to "constant expression"' section 2 including 2.3 (Cohen/Whitlock) as amended: uc {post r1} ** motion: 09-145 'Change "initialization expression" to "constant expression"' section 3 (Cohen/Whitlock): passed 4-2 {in post r1} /INTERP ** motion: 09-115r1 "Interpretation re namelist output" section 2 as F03/0128 (Whitlock/Cohen): uc ** motion: 09-115r1 section 3 as the fix for F2008 (Whitlock/Cohen): uc ** motion: 09-121r1 "Interoperability defects" section 2 as F03/0129 (Whitlock/Cohen): uc ** motion: 09-121r1 section 3 as the fix for F2008 (Whitlock/Cohen): uc Paper 09-148 "Interpretation F03/0063": SV: answer 1 - answer 2 - undecided: 7-0-0 ** motion: 09-148 answer 1 as F03/0063 (Whitlock/Cohen): uc Add note in 006A: put all of edit 1 and edit 2 [98:21-22] in F2008 ** motion: 09-149 "Reconsideration of interp F03/0064" (Whitlock/ Cohen): uc 4.2 Tutorials (if needed) - None 4.3 Subgroup meetings 4.4 TAG meeting (3:45 pm) 4.5 Subgroup reports /JOR ** motion: 09-114r2 "Namelist edits" (Whitlock/Long): withdrawn /DATA ** motion: 09-146 'Small problems with "scope" and BLOCK' (Cohen/ Snyder): uc /HPC ** motion: 09-142r2 "UTI's 155-158 - LOCK variables, C6" (Long/ Cohen) as amended: uc {post r3} ** motion: 09-147r1 "UTI's 159,160 - [UN]LOCK statements, C8" as amended (Long/Cohen): uc {post r2} /INTERP ** motion: 09-150 "Interp F03/0065" (Whitlock/Snyder): uc /J3 09-109 'Editorial stuff concerning "transfer of control"' and 09-120 "Pointer components and coindexed arguments" will have no further action at this meeting. The list of papers for voting, discussion, or action later in the week was discussed. Friday's closing business was started early. 5.2 J3 Closing business 5.3 Review of action items (if any) 1. Van Snyder: Insure J3 can meet at the Fairfield Inn Marriott in Las Vegas for the rest of 2009. 2. Malcolm Cohen: Distribute the next draft of F2008 09-007r1. 3. Stan Whitlock: Run an interp letter ballot on all of the F2003 interps that have been passed by J3 meetings. 4. Stan Whitlock: Inform IBM that they are in jeopardy of losing membership; they must be represented at the next meeting, m188, to retain their membership. 5. Stan Whitlock: Give updated 09-001 to Dan Nagle as official J3 membership list for the web site. 5.4 Future meetings - Van Snyder Meetings 188, 189, and 190 will be at Fairfield Inn in Las Vegas. Van already has the contracts for that facility. Meeting #188 is May 4 - 8, 2009, in Las Vegas, NV, Monday-Friday, joint with WG5, Van Snyder, acting host Meeting #189 is August 10-14, 2009, in Las Vegas, NV, Jim Xia, acting host Meeting #190 is November 9-13, 2009, in Las Vegas, NV, Stan Whitlock, acting host See Appendix C for details of future meetings. 5.5 Treasurer's report - Van Snyder 09 Feb 2009 Opening balance 2485.91 09 Feb 2009 Meeting 187 fees + 350.00 13 Feb 2009 Expenses -- Dan Nagle - 101.01 13 Feb 2009 Expenses -- Fairfield Inn - 158.28 13 Feb 2009 Closing balance 2576.62 Outstanding obligations: none ** motion: We will have no meeting fee for meeting #188 (Snyder/ Nagle): uc The Treasurer's Report is in paper 09-152. 5.6 Closing membership report S. Whitlock Total Membership at beginning of Meeting 187 8 Majority 5 Quorum 4 Total Membership at end of Meeting 187 8 Total Members Attended or Represented at 187 6 Total Attendees at Meeting 186 7 + guest Mallory North +1 == 8 Membership changes since last meeting: IBM has missed 2 of the last 3 meetings and is in jeopardy of losing membership; they must be represented at the next meeting, m188, to retain their membership. See appendix E for the detailed membership summary. Recessed 5. Friday, February 13, 2009 9:00 AM ------------------------------------- 5.1 F2008 Plenary /JOR ** motion: 09-114r3 "Namelist edits" (Whitlock/Long): uc /HPC ** motion: 09-151 "UTI 152, Execution sequence" (Long/Whitlock): uc /INTERP ** motion: 09-137r1 "Applying F03 corrigendum 3 to 09-007" (Whitlock/Snyder) as amended: uc {post r2} ** motion: 09-138r1 "Applying F03 corrigendum 4 to 09-007" (Whitlock/Long) as amended: uc {post r2} ** motion: N1771 as F2003 Corrigendum 4 (Whitlock/Snyder): uc 5.2 J3 Closing business 5.3 Review of action items - see Thursday 5.4 Future meetings - see Thursday 5.5 Treasurer's report - see Thursday 5.6 Closing membership report - see Thursday 5.7 Comments from members None recorded. J3 meeting #187 Adjourned at 8:48 AM on Friday February 13, 2009 ---------------------------------------------------------------------- Appendix A: Final Agenda for J3 Meeting 186 ------------------------------------------------------------------------ Final Agenda for J3 Meeting 187 =============================== 1. Monday, February 9, 2009 8:00 am ------------------------------------- 1.1 Opening business D. Nagle Remarks from the chair D. Nagle Adoption of agenda D. Nagle Approval of Meeting 186 minutes D. Nagle NCITS/OMC report (if any) D. Nagle WG23 report (if any) D. Nagle ISO/WG5 report Van Snyder, IR J11 Liaison report (if any) C. Rasmussen MPI Liaison report (if any) C. Rasmussen UPC Liaison report (if any) D. Nagle Treasurer's report V. Snyder Beginning membership report S. Whitlock Local arrangements D. Nagle Comments from members 1.2 Tutorials (if needed) 1.3 Subgroup organization D. Nagle 1.4 Subgroup meetings 1.5 Subgroup reports (4:30 pm) 2. Tuesday, February 10, 2009 8:00 am -------------------------------------- 2.1 F2008 Plenary (00-010) Subgroup Heads 2.2 Tutorials (if needed) 2.3 Subgroup meetings 2.4 Subgroup reports (4:30 pm) 3. Wednesday, February 11, 2009 8:00 am ---------------------------------------- 3.1 F2008 Plenary Subgroup Heads 3.2 Tutorials (if needed) 3.3 Subgroup meetings 3.4 Subgroup reports (4:30 pm) 4. Thursday, February 12, 2009 8:00 am --------------------------------------- 4.1 F2008 Plenary Subgroup Heads 4.2 Tutorials (if needed) 4.3 Subgroup meetings 4.4 TAG meeting (3:45 pm) Van Snyder, IR 4.5 Subgroup reports (4:00 pm) 5. Friday, February 13, 2009 8:00 am -------------------------------------- 5.1 F2008 Plenary Subgroup Heads 5.2 Closing business 5.3 Review of action items (if any) 5.4 Future meetings V. Snyder 5.5 Treasurer's report V. Snyder 5.6 Closing membership report S. Whitlock 5.7 Comments from members Adjournment ---------------------------------------------------------------------- Appendix B: J3 REGISTER OF DOCUMENTS FOR 2009 -------------------------------------------------------------------------- PAPERS SUBMITTED FOR J3 MEETING 187 LAS VEGAS, NEVADA, February 09 - 13, 2009 -------------------------------------------------------------------------- Paper Number Date Submitter Title -------------------------------------------------------------------------- J3/09-001 090201 Whitlock Membership txt J3/09-006A 090201 Whitlock Outstanding Interpretations txt J3/09-006AT4 090201 Whitlock Interpretations for Draft 2003 Cor 4 txt J3/09-007 090101 Cohen Draft Revision of Fortran Standard pdf J3/09-018 090206 Cohen Interpretation Update Pages pdf J3/09-100 090101 Whitlock Meeting 186 Minutes txt J3/09-101 090108 Cohen More editorial corrections to 08-007r2 txt J3/09-102 090109 Cohen Editor's report for production of 09-0 txt J3/09-103 090109 Cohen Revised interp F03/0119 and F08 fix. txt J3/09-104 090109 Snyder Organizational inconsistencies concern txt J3/09-105 090112 Snyder Clarify interaction of P and F editing txt J3/09-105r1 090210 Whitlock Clarify interaction of P and F editing txt J3/09-106 090112 Snyder Relationship between scale factor and txt J3/09-106r1 090209 Whitlock Relationship between scale factor and txt J3/09-107 090112 Snyder Editorial stuff txt J3/09-107r1 090209 Long Editorial stuff txt J3/09-107r2 090210 Whitlock Editorial stuff txt J3/09-108 090112 Snyder Alternative and simpler method for ato txt J3/09-109 090113 Snyder Editorial stuff concerning "transfer o txt J3/09-110 090113 Snyder Result Value paragraph of 13.7.64 GAMM txt J3/09-111 090113 Snyder Editorial stuff concerning namelist txt J3/09-112 090115 Long UTI 162, ATOMIC constants kinds txt J3/09-113 090126 Cohen Spurious defined terms in clause 3. txt J3/09-113r1 090210 Whitlock Spurious defined terms in clause 3. txt J3/09-114 090126 Reid Namelist edits txt J3/09-114r1 090211 Whitlock Namelist edits txt J3/09-114r2 090212 Whitlock Namelist edits txt J3/09-114r3 090212 Whitlock Namelist edits txt J3/09-115 090126 Reid Interpretation re namelist output txt J3/09-115r1 090210 Whitlock Interpretation re namelist output txt J3/09-116 090126 Long and John Coindexed actual arguments txt J3/09-116r1 090210 Cohen Coindexed actual arguments txt J3/09-117 090126 Long and John UTI 154, KIND of VALUE in ATOMIC_DEFIN txt J3/09-118 090126 Long and John Coindexed scalars txt J3/09-118r1 090211 Cohen Coindexed scalars txt J3/09-119 090126 Reid Files connected to more than one unit txt J3/09-119r1 090209 Long Files connected to more than one unit txt J3/09-119r2 090211 Long Files connected to more than one unit txt J3/09-119r3 090212 Long Files connected to more than one unit txt J3/09-120 090126 Reid Pointer components and coindexed argum txt J3/09-121 090127 Cohen Interoperability defects txt J3/09-121r1 090211 Cohen Interoperability defects txt J3/09-122 090127 Cohen Spurious defined terms in clause 4. txt J3/09-122r1 090210 Cohen Spurious defined terms in clause 4. txt J3/09-123 090129 Cohen Spurious defined terms in clause 5. txt J3/09-124 090129 Cohen Spurious defined terms in clause 6. txt J3/09-125 090202 Cohen Spurious defined terms in clause 7. txt J3/09-126 090202 Cohen Spurious defined terms in clause 8. txt J3/09-126r1 090210 Cohen Spurious defined terms in clause 8. txt J3/09-127 090203 Cohen Spurious defined terms in clause 9. txt J3/09-127r1 090210 Whitlock Spurious defined terms in clause 9. txt J3/09-128 090203 Cohen Spurious defined terms in clause 10. txt J3/09-129 090203 Cohen Spurious defined terms in clause 11. txt J3/09-129r1 090209 Cohen Spurious defined terms in clause 11. txt J3/09-130 090204 Cohen Spurious defined terms in clause 12. txt J3/09-130r1 090209 Cohen Spurious defined terms in clause 12. txt J3/09-131 090204 Reid UTI 153 txt J3/09-131r1 090209 Long UTI 153 txt J3/09-131r2 090211 Snyder UTI 153 txt J3/09-131r3 090212 Cohen UTI 153 txt J3/09-132 090205 Cohen Spurious defined terms in clause 13. txt J3/09-132r1 090210 Whitlock Spurious defined terms in clause 13. txt J3/09-133 090205 Cohen Spurious defined terms in clause 14. txt J3/09-134 090205 Cohen Spurious defined terms in clause 15. txt J3/09-134r1 090209 Cohen Spurious defined terms in clause 15. txt J3/09-135 090205 Cohen Spurious defined terms in clause 16. txt J3/09-136 090209 Cohen Editorial corrections txt J3/09-137 090209 Cohen Applying F03 corrigendum 3 to 09-007. txt J3/09-137r1 090212 Whitlock Applying F03 corrigendum 3 to 09-007. txt J3/09-137r2 090213 Whitlock Applying F03 corrigendum 3 to 09-007. txt J3/09-138 090209 Cohen Applying F03 corrigendum 4 to 09-007. txt J3/09-138r1 090212 Whitlock Applying F03 corrigendum 4 to 09-007. txt J3/09-138r2 090213 Whitlock Applying F03 corrigendum 4 to 09-007. txt J3/09-139 090209 Snyder Restructuring numeric types, specifyin txt J3/09-140 090209 Rasmussen Dimension(**) syntax to correct oversi txt J3/09-141 090209 Snyder UTI 151 concerning USE and submodules txt J3/09-142 090210 Long UTI's 155-158 - LOCK variables, C6 txt J3/09-142r1 090211 Long UTI's 155-158 - LOCK variables, C6 txt J3/09-142r2 090212 Long UTI's 155-158 - LOCK variables, C6 txt J3/09-143 090210 Long UTI 161 - LOCK_TYPE, C13 txt J3/09-143r1 090211 Long UTI 161 - LOCK_TYPE, C13 txt J3/09-143r2 090212 Long UTI 161 - LOCK_TYPE, C13 txt J3/09-143r3 090213 Long UTI 161 - LOCK_TYPE, C13 txt J3/09-144 090211 Cohen Fix constants in ISO_FORTRAN_ENV. txt J3/09-145 090211 Cohen Change "initialization expression" to txt J3/09-145r1 090212 Cohen Change "initialization expression" to txt J3/09-146 090211 Snyder Small problems with "scope" and BLOCK txt J3/09-147 090211 Long UTI's 159,160 - [UN]LOCK statements, C txt J3/09-147r1 090212 Long UTI's 159,160 - [UN]LOCK statements, C txt J3/09-147r2 090212 Long UTI's 159,160 - [UN]LOCK statements, C txt J3/09-148 090211 Long, John Re Interpretation F03/0063 txt J3/09-149 090211 Cohen Reconsideration of interp F03/0064 txt J3/09-150 090212 Snyder Interp F03/0065 txt J3/09-151 090212 Long UTI 152, Execution sequence txt J3/09-152 090213 Snyder Meeting 187 Treasurer's report txt -------------------------------------------------------------------------- Appendix C: Future Meetings and Distribution ------------------------------------------------------------------------ Meeting Conventions: - Four meetings per year - Attempt to schedule second full week of the month - Attempt to schedule meeting contiguous or simultaneous with WG5 annual meeting Future meeting schedule: 188 May 4 - 8, 2009, in Las Vegas, NV {Monday - Friday} ** joint with WG5 Van Snyder, acting host Pre-meeting distribution deadline: April 20, 2009 Pre-meeting distribution: electronic Post-meeting distribution: electronic 189 August 10 - 14, 2009, in Las Vegas, NV Jim Xia, acting host Pre-meeting distribution deadline: July 27, 2009 Pre-meeting distribution: electronic Post-meeting distribution: electronic 190 November 9 - 13, 2009, in Las Vegas, NV Stan Whitlock, acting host Pre-meeting distribution deadline: October 26, 2009 Pre-meeting distribution: electronic Post-meeting distribution: electronic Committee materials availability: Agenda and meeting notice available at the J3 web site. Sent individually to other interested parties that specifically request to be sent the material either via surface mail or electronic mail. REQUIREMENT: Distribution 4 weeks prior to meeting (SD-2 4.3.3) Pre- and post-meeting distribution available at the J3 web site. Sent individually to other interested parties that specifically request to be sent the material via electronic mail. REQUIREMENT: Distribution of premeeting 2 weeks prior to meeting. (documents for action - two week rule: SD-2 4.3.4:1) Meeting minutes are available at the J3 web site. ------------------------------------------------------------------------ J3 World Wide Web site URL: http://www.j3-fortran.org ------------------------------------------------------------------------ Appendix D: Committee Organization D.1 Officers and Management Chair D. Nagle International Rep. V. Snyder Secretary S. Whitlock Treasurer V. Snyder Librarian D. Nagle Editor M. Cohen (WG5 appointment) Maintenance S. Whitlock Vocabulary Rep. none Future Meetings V. Snyder Membership List S. Whitlock IFIP WG2.5 Numerical Software V. Snyder J11 Liaison - C language C. Rasmussen OWG-V Liaison D. Nagle MPI Forum C. Rasmussen UPC D. Nagle D.2 Subgroups JOR: Responsible for the maintenance of the Journal of Development (standing document 004) S. Whitlock (head), D. Nagle DATA: Responsible for language design topics related to data and data structures M. Cohen (head), A. Donev, J. Martin, V. Snyder INTEROP: Responsible for interoperability with C B. Long (head), M. Ingrassia, J. Xia HPC: Responsible for topics in High Performance Computing B. Long (head), M. Ingrassia, C. Rasmussen, J. Xia INTERP: Responsible for evaluating interpretation requests, providing responses to such requests, and maintaining standing document 006 S. Whitlock (head), M. Cohen ---------------------------------------------------------------------- Appendix E: Membership summary J3 Meeting Attendance (Principal Members) Meeting # 178 179 180 181 182 183 184 185 186 187 Location (state) NV NV NV UK NV NV NV NV JP NV Date (month) 11 02 05 08 11 02 05 08 11 02 (year) 06 07 07 07 07 08 08 08 08 09 Name Affiliation Ingrassia, M Sun V V V V V V V V V A Long, W Cray V V V V V V V V V V Martin, J self V V V V V V V V R V Nagle, D self V V V V V V V V V V Rasmussen, C LANL R V V A R V V V R V Snyder, V JPL/Caltech V V V V V V V V V V Whitlock, S Intel V V V A V V V R R V Xia, J IBM A A1 V** V A V V A V A** J3 Letter Ballot Participation (Principal Members) Meeting # 168 169 170 171 174 181 182 183 184 185 Date (month) 08 10 12 03 12 08 11 01 04 08 (year) 04 04 04 05 05 07 07 08 08 08 Name Affiliation I8 I9 I10 I11 I12 I13 I14 I15 I16 I17 Ingrassia, M Sun V A** V V V V V V A V Long, W Cray V V V V V V V V V V Martin, J self A V V V A V V V A R Nagle, D self V V V V V V V V V V Rasmussen, C LANL E A V A** V V A V V V Snyder, V JPL/Caltech V V V V V V V V V V Whitlock, S Intel V V V V V V V V V V Xia, J IBM V V V V V1 V V V V V V present and voting Voting alternates: R absent but represented None A absent and not represented P present and not voting RP represented by previous member E Excused Non-voting alternates: Q Resigned M. Cohen (for J. Martin) ** missed 2 of last 3 meetings/votes *** lost membership 1 J Xia replaced R James as the IBM representative at m180 Total Membership at beginning of Meeting 187 8 Majority 5 Quorum 4 Total Membership at end of Meeting 187 8 Total Members Attended or Represented at 187 6 Total Attendees at Meeting 186 7 + guest Mallory North +1 == 8 Membership changes since last meeting: IBM has missed 2 of the last 3 meetings and is in jeopardy of losing membership; they must be represented at the next meeting, m188, to retain their membership. ---------------------------------------------------------------------- Appendix F: Membership Roster The Membership Roster is not reproduced here. The current Membership Roster may be found on the J3 web site at http://www.j3-fortran.org by clicking on the tab "J3 Members" and then clicking on the pointer to "full membership list".